Quick answer: Work backward from move-in. Applications, contractor booking, design freeze, translation, printing and shipping each have their own lead time.
What this guide will cover
12 to 9 months out
- Shortlist shows and confirm dates
- Request application forms
- Set a budget range
9 to 6 months out
- Apply for space and choose a booth type
- Brief a booth contractor
- Read the exhibitor manual
6 to 3 months out
- Freeze booth design
- Translate and proof materials
- Book travel and interpreters
3 months to move-in
- Place print orders
- Ship exhibits
- Confirm power and internet orders
Show and after
- Staff the booth
- Capture leads
- Follow up within a week
This guide is being expanded. In the meantime, confirm all dates, costs and rules with the show organizer.